turbine Start up | Critical Speed of Shaft |

Rate this post

turbine Start up

CRICTICAL SPEED OF SHAFT SYSTEMS

First stage   820rpm (Generator)

Second stage   1840rpm (HP & IP)

Third stage    1958rpm (LP)

Fourth stage   2090rpm(Generator)